Application for Environmental Assessment Certificate

The Mackenzie Green Energy Centre has been awarded a long-term contract from BC Hydro to supply clean power as a result of their 2006 Call for Tenders. Pristine Power and Balanced Power Engineering are developing an economically, environmentally and socially sustainable solution to meet BC’s urgent need for new sources of electricity while using creative means to help mitigate the impact of the Pine Beetle epidemic.

The Mackenzie Green Energy Centre will harness energy from woodwaste in BC’s northern interior to produce enough green electricity for up to 50,000 homes per year, provide an economic source of steam to the Pope & Talbot mill through co-generation, eliminate up to six beehive burners and contribute to improved air quality.

Below are the sections of the Mackenzie Green Energy Centre's Environmental Assesment in PDF form.

 

Volume 1 - Environmental Assessment Report

Title Page (10.8 KB)

List of Authors (260 KB)

Executive Summary (58 KB)

Table of Contents (110 KB)

Abbreviations and Glossary (40.8 KB)

Section 1 - Introduction (232 KB)

Section 2 - Consult (146 KB)

Section 3 - Project Design (878 KB)

Section 4 - Scope (49.5 KB)

Section 5-1 to 5-3 - Environmental (1.05 MB)

Section 5-4 - Environmental (2.56 MB)

Section 5-5 to 5-11 - Environmental (4.63 MB)

Section 5-12 to 5-18 - Environmental (606 KB)

Section 6 - First Nations (125 KB)

Section 7 - Socioeconomic (234 KB)

Section 8 - Cumulative (64 KB)

Section 9 - EMP (38.2 KB)

Addendum - Approved Terms of Reference (404 KB)

 

 

Volume 2 - Appendices

Title Page (10.7 KB)

List of Appendices (17.2 KB)

Appendix A - Project Design - Title Page (9.11 KB)

Appendix A - Project Design 1 (503 KB)

Appendix A - Project Design 2 (379 KB)

Appendix A - Project Design 3 (617 KB)

Appendix B - Consult - Title Page (9.17 KB)

Appendix B - Consult 1 (25.8 KB)

Appendix B - Consult 2 (2.42 MB)

Appendix B - Consult 3 (494 KB)

Appendix B - Consult 4 (112 KB)

Appendix B - Consult 5 (740 KB)

Appendix B - Consult 6 (108 KB)

Appendix C - Geophysical and Groundwater (1.34 MB)

Appendix D - Climate and Meteorology (2.49 MB)

Appendix E - Modelling Results 1 (2.31 MB)

Appendix E - Modelling Results 2 (4.12 MB)

Appendix E - Modelling Results 3 (2.95 MB)

Appendix F - Biophysical (4.13 MB)

 

Appendix G - Arch and TLUS reports

Appendix H - Stormwater (3.67 MB)

Appendix I - Waste Management (28.8 KB)

Appendix J - Air Quality Management (28.6 KB)

Appendix K - Hazardous Waste Management (34.8 KB)

Appendix L - Spill Management (43.1 KB)

Appendix M - Landscape (23.1 KB)

 

For more information, please contact:

Mackenzie Green Energy Inc.
1-866-944-6401
info@mackenziegreenenergy.ca